Investor: Hillwood

Location: Sosnowiec

Built-up area: 7 080 m²

Construction of a warehouse with an area of 7,080 m2

An old adit was unearthed during the earthworks, which was not inventoried in any mining documents. Connection to existing networks (external installations) located within the park.

Sosnowiec01
Sosnowiec04