The project consisted of the construction of a storage hall of prefabricated reinforced concrete and steel construction with a panel cladding for the storage of stone slabs on the floor. Additional lighting was provided by a light band and facade windows. For the internal transport of the stored material, a double-girder crane with a lifting capacity of 5 t was installed in the hall.